[[ImgSrc-search]]
Contact Us
Tel: +86-510-82231883
Mob: +8613961763050
E-mail: wxruifeng@vip.163.com
Address: 2008 Li Hu Wuxi Li Lake Avenue Business Park 16, Jiangsu, China
Home > News > Content
Ruifeng Participates In The Bidding For The Technical Development Of The Self-elevating Offshore Wind Power Large Parts Replacement Operation And Maintenance Platform
Sep 20, 2018

On September 18th, the MARIC signed a technology development contract with the Fujian Mawei Shipbuilding Co., Ltd. for the replacement of the large-scale offshore wind power components. Wu Weijun, assistant to the director of the MARIC, attended and signed the development contract.

 

The platform is designed and developed by MARIC and Mawei Shipbuilding for Fujian Offshore Wind Power Operation and Maintenance Service Co., Ltd. (Haidian Operation and Maintenance). It is the most advanced offshore wind power large parts replacement operation and maintenance designed and built by China. The platform will play an active role in promoting China's marine engineering equipment technology, making it bigger and stronger. The development of the platform adheres to the concept of “safety, innovation, environmental protection and energy saving”. The performance parameters of all aspects are in the domestic leading position in the replacement of operation and maintenance equipment for offshore wind power. It is equipped with a lifting rig with a lifting capacity of 600 tons. Effective DP-1 dynamic positioning wind power operation and maintenance platform, with tower crane hoisting and fan installation capacity and partial pile foundation construction of 8 MW and below offshore wind turbine foundation; living area is set at the port side of the port, the working deck is smooth around; the navigation area meets International dispatch requirements, the speed is about 5 knots, meet the TIERII emission requirements.

 

At present, China's offshore wind power industry is still in the early stage of development, and there is a lot of space for future development. As the earliest design and research institute in the field of wind power installation equipment, the MARIC developed wind power installation ships and platforms such as 250 tons, 350 tons, 500 tons, 600 tons, 800 tons, 1000 tons, 1200 tons, etc. Exhausted innovation, especially in recent years, under the leadership of Ferron's “Master Studio”, the company has strengthened its R&D and innovation efforts, and has achieved technological breakthroughs in wind power installation ships, which have received extensive attention and praise from the market.

https://www.wxrefine.com/